Built a 20,000 sq. ft. cold storage facility using insulated wall and roof panels, reducing energy costs by 30% while ensuring freshness in distribution…..

Industry: Manufacutring

Time Period: 75 Days

On a sultry evening of April, we were reviewing our sales plan at our H.O, and the phone buzzed from the Architectural team of Larsen and Toubro’s Buildings and….

Industry: Defence

Time Period: 45 Days

It was a sweltering afternoon in the summer of 2021. Amid the buzzing conversations in the office, one topic stood out—the
much-anticipated order from Adani for…..

Industry: Solar Panels

Time Period: 100 Days

-->